Below is a selection of complex projects undertaken by ScafWest.
Feel free to contact us to discuss your specific scenario.

Tiwest/Muchea WA

Erection of 30m high scaffold all round & inside building with monarflex encapsulation for containment.

Structural Systems/Narrows Bridge WA

Required a Platform suspended from above and cantilevered to attaché carbon strengthening. The platform followed the curvature of the bridge.

Garner Perrorr/HMAS Canberra WA

Required access all throughout the ship, mast and over the side for repainting.

Kulin/CBH WA

A circular 1.2m wide platform was built with no interference to the wall that needed work. This platform was raised & lowered with electric winches. The yellow dots are men standing on the platform. The tank was 12 meters in diameter.

AGC/Cockburn Reclaimer

Suspended from above with no way to reach steel work from climbing above, so scaffold had to be progressively constructed by cantilevering forward using FlexiTrussTM.

PTA/Fremantle Rail Bridge

A Mobile hanging platform that rolled on tracking with rubbish chute to remove waste.

Architects WA/Kings Park

Here an access platform with multiple splayed walls where the scaffold had to contour the structure specifically to carry out the work.

Baines Harding/Kellerberin WA

Circular tracking supported above with man and swing stage to paint exterior of tank.

Project Painting Services/IFAP Training Module

All suspended access for re-painting.

Zinco/Albany

45 degree sloping walkway that was stepped to paint the underside.

PMS/Indropilly Bridge NSW

Erection of a 12mx6m rolling mobile to paint underside of bridge.

Eptec/Delos WA

Access for painting required, where the walkway could not be interfered with.

Macro/ECU Joondalup

Tracking supported from roof to carry mobile platform to replace roof & windows.

Kerman/Midland Brick

Large suspend platform constructed over an extreme heat area above kilns.

AGC/Pokahurra

Offshore jacket in fabrication shed with tight erection time. All steel had to be kept clear for painting.

Kulin/Rottnest Light House

Withstanding 70 Knot winds, the platform followed the curve of the structure, with a curved tracking to paint the lower walls of the light house with a swing stage.

AGC/CSBP

Full access to pipe rack for painting.

Thiess/Harvey Dam

Formwork suspended to support scaffold access.

PMS/BP Stack

63m high all levels boarded for re-painting.

Pipe Rack for Painting

Full access to pipe rack for painting.

Tiwest/Chandala

Sloped suspended and bridged access.

Storage Bin

Storage bin strengthening project.

Shutdown/Cataby WA

Remote shutdown Cataby WA.

Port Authority

Port Authority concrete repair - wash thru boards and special.

Contact us to discuss your requirements
Why ScafWest?
Capabilities
Our Guarantee