Below is a selection of complex projects undertaken by ScafWest.
Feel free to contact us to discuss your specific scenario.
Tiwest/Muchea WA
Erection of 30m high scaffold all round & inside building with monarflex encapsulation for containment.
Structural Systems/Narrows Bridge WA
Required a Platform suspended from above and cantilevered to attaché carbon strengthening. The platform followed the curvature of the bridge.
Garner Perrorr/HMAS Canberra WA
Required access all throughout the ship, mast and over the side for repainting.
Kulin/CBH WA
A circular 1.2m wide platform was built with no interference to the wall that needed work. This platform was raised & lowered with electric winches. The yellow dots are men standing on the platform. The tank was 12 meters in diameter.
AGC/Cockburn Reclaimer
Suspended from above with no way to reach steel work from climbing above, so scaffold had to be progressively constructed by cantilevering forward using FlexiTrussTM.
PTA/Fremantle Rail Bridge
A Mobile hanging platform that rolled on tracking with rubbish chute to remove waste.
Architects WA/Kings Park
Here an access platform with multiple splayed walls where the scaffold had to contour the structure specifically to carry out the work.
Baines Harding/Kellerberin WA
Circular tracking supported above with man and swing stage to paint exterior of tank.
Project Painting Services/IFAP Training Module
All suspended access for re-painting.
Zinco/Albany
45 degree sloping walkway that was stepped to paint the underside.
PMS/Indropilly Bridge NSW
Erection of a 12mx6m rolling mobile to paint underside of bridge.
Eptec/Delos WA
Access for painting required, where the walkway could not be interfered with.
Macro/ECU Joondalup
Tracking supported from roof to carry mobile platform to replace roof & windows.
Kerman/Midland Brick
Large suspend platform constructed over an extreme heat area above kilns.
AGC/Pokahurra
Offshore jacket in fabrication shed with tight erection time. All steel had to be kept clear for painting.
Kulin/Rottnest Light House
Withstanding 70 Knot winds, the platform followed the curve of the structure, with a curved tracking to paint the lower walls of the light house with a swing stage.
AGC/CSBP
Full access to pipe rack for painting.
Thiess/Harvey Dam
Formwork suspended to support scaffold access.
PMS/BP Stack
63m high all levels boarded for re-painting.
Pipe Rack for Painting
Full access to pipe rack for painting.
Tiwest/Chandala
Sloped suspended and bridged access.
Storage Bin
Storage bin strengthening project.
Shutdown/Cataby WA
Remote shutdown Cataby WA.
Port Authority
Port Authority concrete repair - wash thru boards and special.
Contact us to discuss your requirements
Why ScafWest?
Capabilities
Our Guarantee